Crate Job Simulator
About
Scz42 MkII Unit 9784 operational directives
Reroute Commodity Routing And Transport Environments (C.R.A.T.E.s) to designated quantum fax repositories.
- Priority 1: Maintain positive input/output ratio.
- Maintaining optimal storage space allocation is secondary priority.
- Arrow to move
- Space to grab/release crate
- Left maj to dash
- Left stick to move
- A to grab/release crate
- RS/R1 to dash
- Fabien Kalinowski
- Loic Siquet
- Quentin Chevalier
- Nicolas Lorent
- Francois Mauge
- Vincent Schneider
System requirements for PC
System requirements for macOS
System requirements for Linux
System requirements for Web
Crate Job Simulator reviews and comments
Related pages
Projection: First Light, ACA NEOGEO THE KING OF FIGHTERS 2000, Genesis, Hangman Pro, Create